1MW Condensing Steam Turbine Generator Unit
Key Features & Advantages
High Efficiency Output: Rated at 1,000 kW with a steam consumption rate of only 8.7 kg/kW·h, maximizing fuel utilization and reducing operating costs.
Proven Condensing Impulse Design: Multi-valve regulation (1C2 + 7P rotor) ensures smooth load response and stable operation across varying steam conditions.
Integrated Generator Set: Directly paired with a 1,000 kW, 400 V, 50 Hz air-cooled generator (Power Factor 0.8, Efficiency 93.9%) for a compact, ready-to-install package.
Advanced Control & Protection: Pure hydraulic governor, mechanical overspeed protection, axial displacement probe, quick-closing emergency valve, and digital tachometer provide multiple layers of safety.
Low Noise & Vibration: Operating noise below 80 dB and shaft vibration below 0.03 mm create a safe and comfortable working environment.
Complete Auxiliary Systems: Includes condenser, vacuum pumping system, steam seal system, oil lubrication/regulation system (46# turbine oil), and electrical turning device for seamless start-up.
Flexible Shipping: Full STG set fits in 2 × 40HQ containers, shipped FOB Shanghai port for cost-effective global delivery.
Proven Condensing Impulse Design: Multi-valve regulation (1C2 + 7P rotor) ensures smooth load response and stable operation across varying steam conditions.
Integrated Generator Set: Directly paired with a 1,000 kW, 400 V, 50 Hz air-cooled generator (Power Factor 0.8, Efficiency 93.9%) for a compact, ready-to-install package.
Advanced Control & Protection: Pure hydraulic governor, mechanical overspeed protection, axial displacement probe, quick-closing emergency valve, and digital tachometer provide multiple layers of safety.
Low Noise & Vibration: Operating noise below 80 dB and shaft vibration below 0.03 mm create a safe and comfortable working environment.
Complete Auxiliary Systems: Includes condenser, vacuum pumping system, steam seal system, oil lubrication/regulation system (46# turbine oil), and electrical turning device for seamless start-up.
Flexible Shipping: Full STG set fits in 2 × 40HQ containers, shipped FOB Shanghai port for cost-effective global delivery.
Technical Specifications
Steam Turbine
|
Parameter |
Value |
|
Turbine Model |
N1.0-1.6 |
|
Rated Power |
1,000 kW (1 MW) |
|
Rated Speed |
6,500 – 1,500 r/min |
|
Inlet Steam Pressure |
1.6 MPa (absolute) |
|
Inlet Steam Temperature |
202 °C |
|
Intake Steam Flow |
8.3 t/h |
|
Steam Consumption Rate |
8.7 kg/kW·h |
|
Exhaust Steam Pressure |
0.008 MPa |
|
Turbine Dimensions |
3,650 × 2,235 × 2,112 mm |
|
Rotor Structure |
1C2 + 7P |
|
Bearing Oil Temperature |
≤ 65 °C |
|
Noise Level |
≤ 80 dB |
|
Design Life |
30 years |
|
Continuous Operation |
≥ 8,000 h/year |
Generator
|
Parameter |
Value |
|
Generator Model |
1FC6566-4LA40 |
|
Generator Power |
1,000 kW |
|
Output Voltage |
400 V |
|
Frequency |
50 Hz |
|
Rated Current |
535 A |
|
Power Factor |
0.8 (lagging) |
|
Efficiency |
93.9% |
|
Insulation Class |
Class F |
|
Cooling Method |
Air Cooling |
|
Wiring Type |
3-Phase 4-Wire |
Video
Typical Applications
• Waste heat recovery power generation in cement, steel, and chemical plants
• Biomass, bagasse, and wood-chip cogeneration systems
• Back-pressure and condensing industrial power stations
• Off-grid and distributed electricity supply for remote industrial facilities
• Biomass, bagasse, and wood-chip cogeneration systems
• Back-pressure and condensing industrial power stations
• Off-grid and distributed electricity supply for remote industrial facilities
Warranty & After-Sales Service
All equipment is guaranteed for a period of 12 months from final acceptance or 18 months from the date of the Bill of Lading, whichever comes first. This warranty covers defects in design, materials, and workmanship under normal operating conditions.
Dongturbo's dedicated after-sales team provides on-site supervision during civil work, erection, and commissioning. Our engineers offer comprehensive technical support to ensure your unit reaches full rated performance as quickly as possible. All technical documentation and drawings are supplied in English using metric units.
Dongturbo's dedicated after-sales team provides on-site supervision during civil work, erection, and commissioning. Our engineers offer comprehensive technical support to ensure your unit reaches full rated performance as quickly as possible. All technical documentation and drawings are supplied in English using metric units.
Contact Us
Dongturbo Electric Company Ltd.
Address: Unit 6-1-1906, S-2, New Century Global Center, No.1700, North Section, Tianfu Avenue, Chengdu, China
Phone / WhatsApp / WeChat: +86 139 0807 3010
Email: dqzhanghaoyue@vip.126.com
Website: www.steamturbo.net
Address: Unit 6-1-1906, S-2, New Century Global Center, No.1700, North Section, Tianfu Avenue, Chengdu, China
Phone / WhatsApp / WeChat: +86 139 0807 3010
Email: dqzhanghaoyue@vip.126.com
Website: www.steamturbo.net