Leave Your Message

2MW Condensing Steam Turbine Generator Unit

Model N2.0-2.35/390 | High-Voltage Industrial Power Generation | Dongturbo Electric

Product Overview

The Dongturbo 2MW Condensing Steam Turbine Generator Unit (Model N2.0-2.35/390) is a heavy-duty, high-voltage power generation system purpose-built for coal-fired boiler plants, waste heat recovery facilities, and large-scale industrial cogeneration projects. Delivering a continuous rated output of 2,000 kW at 10,500 V, this fully integrated turbine-generator set combines proven condensing impulse turbine technology with a state-of-the-art Siemens PLC control platform to achieve superior efficiency, safety, and operational flexibility.

The system accepts inlet steam at 2.35 MPa and 390 °C — typical of medium-pressure industrial boiler outputs — and exhausts into a condenser at near-vacuum pressure (0.0073 MPa), maximising the thermodynamic cycle and extracting maximum electrical energy from every kilogram of steam. Each unit is delivered as a complete, turnkey package covering the STG set, DEH/ETS/TSI control systems, high-voltage switchgear, circulating water system, and full on-site installation and commissioning services.

    Key Features & Advantages

    High-Voltage Output: 10,500 V generator output directly feeds medium-voltage distribution networks, eliminating the need for an additional step-up transformer in many industrial plant configurations.

    Advanced Siemens PLC Control: Centralized monitoring via LCD & keyboard with DEH speed governor, ETS emergency trip system, and TSI safety monitoring — full start/stop control from the control room with minimal local intervention.

    Triple Overspeed Protection: Two-of-three automatic overspeed relay logic combined with a mechanical flying-hammer emergency breaking device ensures fail-safe shutdown in under 1 second at 6,160–6,272 r/min.

    Premium Material Selection: High-chromium steel (1Cr13) blades, 35CrMoA impeller and main shaft, ZG230-450 cast steel casings — engineered for long-term operation in high-temperature, high-pressure steam environments.

    Complete Turnkey Scope: From STG set and condenser to main steam pipeline, circulating water cooling tower, high-voltage switchgear, unit insulation, and personnel training — all included in a single contract.

    Single-Layer Compact Layout: Designed for installation inside a standard steel structural workshop, minimising civil engineering costs and project footprint.

    Fast Project Delivery: Equipment supply completed within 90 days of contract signing and advance payment receipt; on-site installation and commissioning completed within 60 days.

    Technical Specifications

    STG Operating Parameters

    Parameter

    Value

    Model

    N2.0-2.35/390

    Rated Power

    2,000 kW (2 MW)

    Inlet Steam Pressure

    2.35 MPa (absolute)

    Inlet Steam Temperature

    390 °C

    Inlet Steam Flow

    11 t/h

    Exhaust Steam Pressure

    0.0073 MPa (absolute)

    Turbine Speed

    5,600 r/min

    Overspeed Protection Speed

    6,160 – 6,272 r/min

    Overspeed Protection Response

    < 1 s

    Inlet / Exhaust Pipe Diameter

    DN100 / DN1100

    Inlet & Exhaust Direction

    Side inlet / Upper exhaust

    Generator Voltage

    10,500 V

    Overspeed Protection Mode

    2-of-3 automatic + mechanical flying-hammer emergency trip

    Key Material Specifications

    Parameter

    Value

    Front Casing

    ZG230-450

    Rear Casing

    Q235A

    Blade

    1Cr13

    Impeller

    35CrMoA

    Main Shaft

    35CrMoA

    Front / Rear Bearing Seat

    HT250

    Main Valve Housing

    ZG230-450

    Scope of Supply & Pricing

    The following table details the complete scope of supply included in the standard 2MW STG project package. Total contract price: USD 445,000 per set.

    Typical Applications

    • Coal-fired boiler waste steam power generation in mining and heavy industry
    • Industrial cogeneration (combined heat and power) in steel, cement, and chemical plants
    • Medium-pressure steam utilisation in food processing and paper manufacturing
    • Distributed power generation for remote industrial facilities and factory parks

    Contact Us

    Dongturbo Electric Company Ltd.
    Address: Unit 6-1-1906, S-2, New Century Global Center, No.1700, North Section, Tianfu Avenue, Chengdu, China
    Phone / WhatsApp / WeChat: +86 139 0807 3010
    Email: dqzhanghaoyue@vip.126.com
    Website: www.steamturbo.net

    Make an Free Consultant

    Your Name*

    *Name Cannot be empty!

    Phone Number

    Country

    Remarks*

    * Enter product details such as size, color,materials etc. and other specific requirements to receive an accurate quote. Cannot be empty
    *Need to accept terms
    reset