Leave Your Message

GE Frame 6B Gas Turbine for Sale

35 MW, Combined-Cycle Proven, Only 100 Operating Hours

Model: 6B.03/41.1/5163 | Manufacturer: GE (Nameplate: Nanjing Turbine & Electric Machinery)

This GE Frame 6B gas turbine represents a rare opportunity to acquire a large-scale industrial power asset with an exceptionally low service history — just 100 operating hours — while carrying a fully verified combined-cycle project track record.

    Technical Specifications

    Rated Output: 35,098 kW (41,171 kW at ISO conditions)
    Heat Rate: 11,278 kJ/kWh
    Thermal Efficiency: 31.92%
    Exhaust Gas Temperature: 548.2 °C
    Exhaust Gas Flow: 444.6 t/h
    Fuel Consumption: 11,069 Nm³/h

    Project History

    April 2019 — Full 72+24-hour trial operation and production handover completed on schedule.
    April 2020 — Complete performance acceptance of gas turbine, waste-heat recovery boiler (HRSG) and combined-cycle system successfully passed.
    July 2020 — Final construction settlement finalized.
    July 2022 — Environmental impact assessment (EIA) approval obtained.
    Warranty period expired April 2021; the unit has since operated 5+ years beyond warranty with zero reported failures.

    Why This Unit Stands Out

    With only 100 operating hours logged on the clock, this unit demonstrates exceptionally low levels of mechanical wear across core assemblies, having undergone limited operational runtime throughout its service life. Benefiting from its wellpreserved mechanical condition, the equipment is fully inspected and prepared for rapid redeployment into onsite operations, requiring only minimal precommissioning preparation prior to putting into service.

    Featuring a steady exhaust temperature of 548.2 °C, this unit delivers highgrade waste heat output, rendering it a highly suitable prime mover for integration with a wasteheat recovery boiler. Such pairing supports the implementation of highefficiency combinedcycle power generation or combined heat and power (CHP, cogeneration) system configurations. By harnessing otherwisewasted thermal energy from exhaust streams, the solution substantially elevates overall thermal performance and plant energy efficiency, optimising fuel utilisation and reducing operational energy costs for enduser facilities.

    Full sets of comprehensive technical documentation, including original equipment specifications, operational records, performance acceptance test certificates and historical inspection reports, can be provided upon formal request. Customised inspection arrangements covering onsite equipment verification and condition assessment are also negotiable for interested parties. Please reach out to our commercial team to receive a detailed, tailored proposal aligned with your specific project requirements, site parameters and operational objectives.

    Make an Free Consultant

    Your Name*

    *Name Cannot be empty!

    Phone Number

    Country

    Remarks*

    * Enter product details such as size, color,materials etc. and other specific requirements to receive an accurate quote. Cannot be empty
    *Need to accept terms
    reset