New CAT CG170B-20 gas generator set
Scope of supply
1. The list below is CAT CG170B-20 gas generator set supply scope, which will be provided by seller
|
CAT CG170B-20 Gas generator sets |
||
|
Item |
Supply Scope |
Qty. |
|
1 |
- Engine, base, generator, control cabinet - All of the above in stock |
6 Sets |
2. CAT CG170B-20 Gas generator set basic information
|
Engine |
CAT CG170B-20 |
|
Manufacturer |
CAT |
|
Model |
CG170B-20 |
|
Fuel |
NG |
|
Power |
2300KW |
|
Manufacture time |
2026 |
|
Efficiency |
43.9% |
|
Rotation speed |
1500rpm |
|
Gas exhausted |
80.00 kg/s |
|
Voltage |
400V |
|
Frequency |
50Hz |
|
Intake method |
TA |
|
Cylinder Bore |
170mm |
|
Stroke |
195mm |
|
Lube Oil Consumption |
0.15 g/kWh |
|
Displacement |
89 dm³ |
|
Mean Piston Speed |
9.8 m/s |
|
Mean Effective Pressure |
21.5 bar |
|
Specification |
|
|
L*W*H |
P type:6600×1710×2190 mm;R type:6500×1710×2190 mm |
|
Dry Weight |
P type:21,400 kg;R type:17,980 kg |
3. Onsite pictures
Delivery time
Upon formal execution of the sales contract and successful receipt of the buyer’s downpayment by the seller, the seller shall arrange product dispatch within 15 calendar days. Any potential delays caused by force majeure, buyerside delayed payment or insufficient provision of required technical specifications shall be excluded from the aforementioned delivery timeline. The seller will notify the buyer in advance once goods are ready for shipment, and provide relevant shipping documentation for the buyer’s reference.
Payment terms
1. Fifty percent (50%) of the total contract value shall be remitted by the buyer within 10 calendar days upon signing of the formal contract and issuance of the corresponding commercial invoice by the seller. This portion serves as the contract downpayment to initiate production arrangements.
2. The remaining fifty percent (50%) of the total contract value shall be settled by the buyer after the buyer receives formal written notice from the seller confirming that all ordered products have been fully manufactured and are ready for dispatch. Full settlement of this balance is a precondition for the seller to proceed with goods shipment. All payments shall be made in accordance with the currency and bank account information specified in the signed contract.
2. The remaining fifty percent (50%) of the total contract value shall be settled by the buyer after the buyer receives formal written notice from the seller confirming that all ordered products have been fully manufactured and are ready for dispatch. Full settlement of this balance is a precondition for the seller to proceed with goods shipment. All payments shall be made in accordance with the currency and bank account information specified in the signed contract.
Quality assurance
Not available, the gas turbine generator sets are sold as “as is”
Price validity
This offer will be validated for 10 days.