Siemens SGT600 gas turbine generator set
Scope of supply
1. The list below is Siemens SGT600 GTG set supply scope, which will be provided by seller
|
Siemens SGT600 GTG sets are currently installed |
||
|
Item |
Supply Scope |
Qty. |
|
1 |
- Main unit: Engine, gearbox, generator, and skid;
- Lubrication system: Lubricating oil tank, oil pump, oil cooler, and oil mist separator;
- Starting system: One hydraulic starter unit;
- Control system: One instrument and control system unit;
- Automatic fire extinguishing system: One CO2 automatic fire extinguishing system;
- Gas turbine intake system: Filter device, silencer, and intake duct;
- Enclosure ventilation system: Ventilation fan, silencer, and air duct; |
1 Set |
2. Siemens SGT600 GTG set basic information:
|
Engine |
Siemens SGT600 |
|
Fuel Nozzle |
NG |
|
Power: |
24.5MW |
|
Combustion Type |
DLE |
|
Manufacture time |
2011 |
|
Commissioning time |
2012 |
|
Efficiency |
30.11% |
|
Heat rate |
10535 Kj/kwh |
|
Gas exhausted |
80.00 kg/s |
|
Exhausted Temperature |
543 ℃ |
|
Nox Emission(50%-100% load) |
≤25 PPM |
|
Current status |
In January 2026, the unit was started 52 times, with a total operating time of 374 hours and an equivalent operating time of 553 hours. Due to high natural gas prices and poor operating efficiency, the unit was essentially in hot standby mode. |
|
Generator: |
ABB-AMS 1120LC |
|
Frequency: |
50HZ |
|
Capacity: |
29250kva |
|
Voltage: |
10.5KV |
3. Onsite pictures
Price
|
Item |
Description |
Item scope |
Unit Price (USD) |
Qty (e.a) |
Total-USD |
|
1 |
Siemens SGT600 GTG set |
1 |
13,000,000.00 |
1 |
13,000,000.00 |
|
TOTAL FOB SHANGHAI AMOUNT IN USD |
|
13,000,000.00 |
|||
Delivery time
Payment terms
- 50% of contract amount shall be paid after the receipt of the products readiness from Seller.