Leave Your Message

Siemens SGT600 gas turbine generator set

We, Dongturbo, hereby would like make our best offer as follows for your target products.

  • Engine Siemens SGT600
  • Fuel Nozzle NG
  • Power 24.5MW
  • Combustion Type DLE
  • Efficiency 30.11%
  • Heat rate 10535 Kj/kwh
  • Gas exhausted 80.00 kg/s

Scope of supply

1. The list below is Siemens SGT600 GTG set supply scope, which will be provided by seller

Siemens SGT600 GTG sets are currently installed

Item

Supply Scope

Qty.

1

- Main unit: Engine, gearbox, generator, and skid;

 

- Lubrication system: Lubricating oil tank, oil pump, oil cooler, and oil mist separator;

 

- Starting system: One hydraulic starter unit;

 

- Control system: One instrument and control system unit;

 

- Automatic fire extinguishing system: One CO2 automatic fire extinguishing system;

 

- Gas turbine intake system: Filter device, silencer, and intake duct;

 

- Enclosure ventilation system: Ventilation fan, silencer, and air duct;

1 Set

2. Siemens SGT600 GTG set basic information:

Engine

Siemens SGT600

Fuel Nozzle

NG

Power:

24.5MW

Combustion Type

DLE

Manufacture time

2011

Commissioning time

2012

Efficiency

30.11%

Heat rate

10535 Kj/kwh

Gas exhausted

80.00 kg/s

Exhausted Temperature

543 ℃

Nox Emission(50%-100% load)

≤25 PPM

Current status

In January 2026, the unit was started 52 times, with a total operating time of 374 hours and an equivalent operating time of 553 hours. Due to high natural gas prices and poor operating efficiency, the unit was essentially in hot standby mode.

Generator:

ABB-AMS 1120LC

Frequency:

50HZ

Capacity:

29250kva

Voltage:

10.5KV

3. Onsite pictures

drawing
drawing
drawing
drawing
drawing
drawing

Price

Siemens SGT600 GTG set price is as below

Item

Description

Item scope

Unit Price

(USD)

Qty

(e.a)

Total-USD

1

Siemens SGT600 GTG set

1

13,000,000.00

   1

13,000,000.00

TOTAL FOB SHANGHAI AMOUNT IN USD

 

13,000,000.00

The above price includes the cost of the scope of supply mentioned in item 1, disassemble cost, packaging and transportation cost to Shanghai port.

Delivery time

The products will be dispatched within 3 MONTHS after the contract signed and downpayment received.

Payment terms

- 50% of contract amount shall be paid with 10 days after contract signed and issuing invoice. 
- 50% of contract amount shall be paid after the receipt of the products readiness from Seller.

Quality assurance

Not available, the gas turbine generator sets are sold as “as is” 

Price validity

This offer will be validated for 10 days.

Make an Free Consultant

Your Name*

*Name Cannot be empty!

Phone Number

Country

Remarks*

* Enter product details such as size, color,materials etc. and other specific requirements to receive an accurate quote. Cannot be empty
*Need to accept terms
reset