Blast Furnace Top Gas Recovery Turbine Unit (TRT)
video

Blast Furnace Top Gas Recovery Turbine Unit (TRT)

TRT is a system device for recovering the gas pressure from blast furnace, which does not change the chemical composition of the gas and does not affect the follow-up use. Transformation of the energy can be used to generate electricity or drive other energy consumption equipment.
Send Inquiry
Product Introduction

Blast Furnace Gas Top Pressure Recovery Turbine Supply

TRT is a system device for recovering the gas pressure from blast furnace, which does not change the chemical composition of the gas and does not affect the follow-up use. Transformation of the energy can be used to generate electricity or drive other energy consumption equipment. It use of aero-engine turbo technology.

At present, the company's GT Series of TRT cover all models in the world of the blast furnace, installed capacity from 3000kW to 38000kW, more than 300 sets have already been put into operation.

image003


Axial Compressor Supply

Axial flow compressor uses high speed rotating impeller (blade group) work on the gas. It is an industrial power device for converting mechanical energy into gas pressure energy and heat energy. Axial flow compressor is composed of shell, static blade cylinder, adjusting cylinder, rotor, shaft seal, oil seal, bearing, import lap, diffuser, servo oil cylinder, a balancing pipe and a base.

At present, the company's axial compressor outlet up to 0.85 MPa, maximum air flow rate 10000Nm3/min, applicable to more than 380 m3 all blast furnace and 300 thousand tons / year scale and above all catalytic cracking, more than 30 sets have already been put into operation.

image005(001)


Types & Specification of Axial Compressor

Model

Medium

Number of

Stages

Boost Ratio

Flow(Nm3/min)

Shaft power

Revolute

Speed(r/min)

Match able blast furnace

ACL40

Air

8~15

2.5~8.5

1300~2000

6000~9000

7800~8200

380~450

ACL45

Air

8~15

2.5~8.5

1500~2300

8000~11000

6800~7200

450~550

ACL50

Air

8~15

2.5~8.5

1600~2500

9000~13000

6000~6600

500~750

ACL56

Air

8~15

2.5~8.5

2200~3000

12000~17000

5600~6000

750~1100

ACL63

Air

8~17

2.5~8.5

2700~3750

13000~18000

5300~5600

1000~1200

ACL71

Air

8~17

2.5~8.5

3000~4900

15000~27000

4450~5300

1200~1800

ACL80

Air

8~17

2.5~8.5

4400~6200

21000~37000

4050~4450

1800~2600

ACL90

Air

8~19

2.5~8.5

5300~7300

32000~47500

3650~3800

2500~3200

ACL100

Air

8~20

2.5~8.5

7200~10000

35000~53000

3000~3500

>3200


Compressor and TRT Combination (CTC) Supply

1. Product introduction

CTC three unit "is composed of the axial flow compressor, residual pressure turbine power generation equipment, axial flow compressor. 

image007

image009

2. CTC Advantages

a. Lower investment

The original TRT and axial flow compressor two systems are combined into an integrated system in the coaxial unit of the CTC three unit. Each auxiliary system is composed of the original two sets, the cost is greatly saved, and also can save the price of more expensive generators. The combined system can save about 30% of the construction cost, save the land area of about 30%, reduce the management of human input about 30%.


b. higher effiency

image011

The simplification of the energy conversion process will make the energy recovery rate increase from 5% to 8%, with the energy loss of the motor and the power loss of the power network and the line loss.


c. No interconnection

For most of the iron and steel enterprises, gained the right of TRT power grid is relatively difficult, strict government approval, approval cycle length, high stability requirements, three machine coaxial TRT recovery of direct energy to mechanical energy in the form of driven axial flow compressor, without grid.


d. Reduce operating cost

Iron and steel enterprises will put power into the electricity grid, then take power from the electricity grid, due to send electricity price is higher than get electricity price, cost has a loss. This technology can be used to avoid the the cost of the loss coming from price difference, reduce operating costs. For the CTC 6.5mw unit installed capacity of the turbine, the light festival about cost of up to more than 500 million yuan.


image014


Hot Tags: blast furnace top gas recovery turbine unit (trt), China, suppliers, manufacturers, factory, customized, wholesale, buy, price, cheap, bulk, quotation, discount, design, for sale, free sample, made in China, High and Low Pressure Heater, Oil Station, Blast Furnace Top Gas Recovery Turbine Unit TRT , Condenser, Debris Filter

Send Inquiry

whatsapp

Phone

E-mail

Inquiry