
3MW-200MW Coal/Biomass/Waste Fired Power Plant EPC for Paper Mill
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
We deeply realize that if we want our company to have a good reputation, we should continuously improve the quality of our Oil/gas-fired Saturated Steam Boiler, Static Thyristor Generator, Boiler Pipes and Accessories and provide sincere service. Your satisfaction is our unswerving work goal. Because we know that responsibility is heavier than Mount Tai and life is above everything else, what we provide is not only high-quality products and services, but also a commitment to user production and safety. Employee access, training and expectations: our corporate values, ethical standards, policies and practices are committed to the protection of customer information. Building an excellent company culture that suits our company's characteristics is the foundation for cultivating the company's core competitiveness.
The Service Provided By DTEC
● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
EPC Practice
● Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.
![]() | ![]() |
BOT Practice
Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.
Complete Set Of Equipment Supply Practice
Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.
Engineering & Supervision Practice
Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.
Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.
This style of cooperation is mainly happen in China with Chinese client.
Along with the 'Client-Oriented' enterprise philosophy, a rigorous high-quality control process, superior production products along with a robust R&D group, we constantly deliver premium quality products, exceptional solutions and aggressive costs for 3MW-200MW Coal/Biomass/Waste Fired Power Plant EPC for Paper Mill. We have established standardized office facilities, and have production and management staff who are professional and of high quality. The company is committed to continuous innovation and improvement so that we can continue to meet customer needs and expectations in terms of product variety, quality, cost effectiveness, and service.
You Might Also Like
Send Inquiry











