7HP Low Noise Air Cooled B Itzer Compressor Condensing Unit 4DC-7.2

7HP Low Noise Air Cooled B Itzer Compressor Condensing Unit 4DC-7.2

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

We have made major breakthroughs in the innovation of our Bagasse Boiler, Oil/gas-fired Saturated Steam Boiler, Unit Retrofitting and strengthened our core competitiveness through a two-wheel drive of management innovation and technological innovation. We promote the scale of the enterprise, market-oriented, in professional direction. We strive to spread new products and services around the world and build industrial clusters. We believe that through our continuous efforts and pursuit, we will be able to achieve mutual benefit and win-win results with customers at home and abroad! We abandon inert and stereotypical thinking, and innovate to break through conventional constraints.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


High Performance for 7HP Low Noise Air Cooled B Itzer Compressor Condensing Unit 4DC-7.2, We put the product quality and customer's benefits to the first place. It is proved by users that the product has stable performance and good use effect, and is deeply welcomed and praised. We continue to improve the efficiency of execution and enhance quality and efficiency.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry