
Bitzer Compressor R404A 4FES-3 (Y) , Semi-Hermetic Compressor for Truck Refrigeration Unit & Cold Room 3.0 HP Old Model 4FC-3.2 (Y)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
We create opportunities for horizontal exchanges in the Biomass and MSW Power Plant EPC, Biomass Boiler, Cement Kiln Waste Heat Boiler industry and introduce professional leaders externally to accelerate the pace of our development. In terms of operations, we always advocate people-based management and insist on talent being the source of business development. We focus on strict quality control and process management, and have formed a unique and connotative corporate culture. We lay the most solid foundation, use the best bricks and stones, and build the strongest company building with the most dedicated and patient attitude. We are constantly inspired by the belief of innovation, continuous transcendence, service first and reputation first.
The Service Provided By DTEC
● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
EPC Practice
● Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.
![]() | ![]() |
BOT Practice
Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.
Complete Set Of Equipment Supply Practice
Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.
Engineering & Supervision Practice
Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.
Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.
This style of cooperation is mainly happen in China with Chinese client.
With the demand for specialized and refined development of the Bitzer Compressor R404A 4FES-3 (Y) , Semi-Hermetic Compressor for Truck Refrigeration Unit & Cold Room 3.0 HP Old Model 4FC-3.2 (Y), we have successfully established a firm foothold in the market. Talent is the valuable asset of the enterprise and the driving force for the enterprise to move forward. The company takes the responsibility of making satisfactory products available to people all over the world, and it continues to work hard to create brand-new products.
You Might Also Like
Send Inquiry











