Bitzer Reciprocating Air Conditioner Compressor 6f-50.2-40p

Bitzer Reciprocating Air Conditioner Compressor 6f-50.2-40p

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

Our Parts and Auxiliary Equipment, Blast Furnace Top Gas Recovery Turbine Unit (TRT), Oil/gas-fired Saturated Steam Boiler has a wide range of uses, we use the original intention to wait for your rest assured, to create tough quality. We have always been praised by users and won the market for the high quality of products, reasonable prices, punctual delivery, and good service. Enterprise goal: high technology, high quality as the axis, value-added services for the added value, to establish a first-class company with international competition level.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


We take the high starting point, the high investment, the high quality as the development strategy, is takes the research and development, the manufacture, the sale and the after-sales service as a body Bitzer Reciprocating Air Conditioner Compressor 6f-50.2-40p manufacture enterprise. In the past development process, we insist on advancing with the times, the concept is constantly innovated, and the product structure is constantly adjusted. Normally to the majority of business users and traders to offer best quality goods and excellent company.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry