Captive Power Plant EPC Contractor for Steel Mill, Cement Factory, Paper Mill
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
We always get the job done to be a tangible staff to ensure that we can easily offer you the best high-quality and the greatest value for Auxiliary Equipment Retrofitting, Extraction Back Pressure Type, Biomass Boiler. We adhere to people-oriented, is a performance-oriented company that values the talent environment. We encourage continuous innovation and active practice in product technology development, productivity improvement and workflow optimization. Our company has earned a marvelous reputation for its advanced technology and reliable quality. We offer the best solution without any compromise to quality, service or delivery for our customer.
The Service Provided By DTEC
● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
EPC Practice
● Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.
![]() | ![]() |
BOT Practice
Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.
Complete Set Of Equipment Supply Practice
Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.
Engineering & Supervision Practice
Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.
Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.
This style of cooperation is mainly happen in China with Chinese client.
We achieve the best from the details of our Captive Power Plant EPC Contractor for Steel Mill, Cement Factory, Paper Mill and strive to create first-class work quality and product quality. Our goal is to make every customer satisfied with our mission: responsibility, focus, innovation and development. We have the courage to take the responsibility, take the initiative, and go all out to achieve the annual production and operation tasks.