Coal/Biomass/Waste to Energy Power Plant EPC Projects

Coal/Biomass/Waste to Energy Power Plant EPC Projects

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

We can develop new Boiler Parts, Debris Filter, Waste Heat Boiler according to the needs of the market. We deeply know that "product quality is the foundation of an enterprise" is not only a spirit, but also a responsibility. After years of development, the equipment level of our company has reached a high level. We actively participate in market competition to expand our market share and increase our market awareness. Excellent corporate culture is the soul of corporate management, the spiritual core that unites employees, and an important part of corporate development strategy.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


We are constantly improving our production technology and introducing new machines to produce the best Coal/Biomass/Waste to Energy Power Plant EPC Projects with the fastest efficiency and the highest quality. We practice the concept of creating new brands through differentiated innovation, and adhere to brand positioning. We have a lot of customers in both domestic and foreign countries.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry