Cogeneration Combined Heat Power Plant EPC Contractor
Like a result of ours specialty and repair consciousness, our enterprise has won a superb popularity amid buyers everywhere in the environment for Extraction Condensing Steam Turbine, Back Pressure Steam Turbine, Coal-fired Hot Water Boiler. Through our innovation, we will create new solutions and products, and provide users with products with functions and user experience. We insist on working side by side with customers to help them solve problems and create value for them.
Introduction
Our company can provide users with a complete set of power plant solutions, undertake the complete set of equipment supply for the whole power plant and thermal power plant with steam turbine generator sets below 200MW, and undertake the design, feasibility demonstration, civil engineering, installation, commissioning and turnkey projects of power plants and thermal power plants.
Scope of supply
Optional complete project contents include:
1. Feasibility study, energy assessment, environmental assessment and safety assessment
2. Engineering consultation and design
3. Civil engineering contracting
4. Boiler and auxiliary equipment supporting
5. Steam turbine generator set and auxiliary equipment supporting
6. Matching of high and low voltage electrical systems
7. Matching of power transmission and transformation system
8. Matching of circulating water system
9. Matching of chemical water system
10. Supporting fire protection system
11. Supporting lighting system
12, supporting system installation and debugging
13. Training of operators
According to the above, we provide EPC services, and we can choose turnkey general contracting, design-procurement general contracting, procurement-construction general contracting, design-construction general contracting, construction-transfer and other modes according to the needs of users.
Typical Cases
OUR TYPICAL REFERENCE PROJECTS ARE AS FOLLOWS:
1. GUANGDONG DONGGUAN SHENGMING POWER PLANT CO-GENERATION PROJECT
SCOPE: EPC FOR1500KW+800KW POWER PLANT
2. GUANGDONG SHAOGUAN SHILITING POWER PLANT WASTE HEAT PROJECT
SCOPE: EPC FOR 2x2300KW POWER PLANT
3. GUANGDONG DONGGUAN DONGHUA POWER PLANT WASTE HEAT PROJECT
SCOPE: EPCFOR 2x2300KW POWER PLANT
4. GUANGDONG PANYU LIANHUA MOUTAIN POWER PLANT WASTE HEAT PROJECT
SCOPE: EPC FOR 2300KW+1500KW POWER PLANT
5. GUANGDONG PANYU LIANHUA MOUTAIN POWER PLANT WASTE HEAT PROJECT,
SCOPE: EPC FOR 2300KW+1500KW POWER PLANT
6. FUJIAN FUZHOU RONGCHANG POWER LIMITED COMPAMY WASTE HEAT PROJECT
SCOPE: EPC FOR 1x2300KW POWER PLANT
7. SICHUAN YIBIN PAPER 3000KW CO-GENERATION PROJECT,S
SCOPE: ERECTION AND COMMISSIONING FOR 3000KW STG
8. GUANGDONG SHUNDE HUAFA POWER PLANT LIMITED COMPANY WASTE HEATPROJECT
SCOPE: EPC FOR 1x3000KWSTG
9. SICHUAN JIANGYOU POWER PLANT 50MW TURBINE CONTROL SYSTEM REFORM
SCOPE: EPC FOR 4x50MW STG CONTROL SYSTEM REFORM
10. GUANGDONG DONGGUAN ZHANGMUTOU GANGZHONG POWER LIMITED
SCOPE: EPC FOR 1>3000KWSTG
11. SHENZHEN SHANGDONG POWER PLANT WASTE HEAT PROJECT
SCOPE: EPC FOR 2x1700KW STG
12. SHENZHEN KUIYONG POWER PLANT WASTE HEAT POWER PROJECT
SCOPE: EPC FOR 3x800KWSTG
13. SICHUAN LONGMANG GROUP 750MW CO-GENERATION PROJECT
SCOPE: EPC FOR 1X750KW STG
14. GUANGDONG JIANGMEN GUOYANG THERMOELECTRICITY LIMITED COMPANY 50MW TURBINE HEAT SUPPLY REFORM
SCOPE: REFORM FOR 2X50MW TURBINE
15. SICHUAN YIBIN PAPER 12MWTURBINE FLOW REFORM
SCOPE: REFORM FOR IX12MW TURBINE
16. XINJIANG YILI NANGANG THERMOELECTRICITY SOMW TURBINE HEAT SUPPLY AND STEAM EXTRACTION REFORM
SCOPE: REFORM FOR 2X50MWSTEAMTURBINE
17. JIANGSU HUAIAN IRON AND STEEL GROUP 25MW TURBINE HEAT SUPPLY AND STEAM EXTRACTION REFORM
SCOPE: REFORM FOR 1*25MW STEAM TURBINE
18. SICHUAN XINJIN LIANFA SODIUM SULFATE FACTORY 1500KW TURBINE FLOW REFORM
SCOPE: REFORM FOR 1X1500KW STEAMTURBINE
19. SICHUAN MIANYANG CHUANYIN CHEMICAL INDUSTRY GROUP 1500KW TURBINE HEAT SUPPLY AND STEAM EXTRACTION REFORM
SCOPE: REFORM FOR 1x1500KW STG
20. INDONESIA LAMPUNG 2XIISMW COAL FIRED POWER PLANT
SCOPE: 1. ENGINEERING FOR 2x115 MW POWER PLANT
2. SUPPLY FOR BOPEQUIPMENT
3. SITE SUPERVISION FOR POWER PLANT
21. ADJUSTING CABINET REFORMING FOR 2X60MW UNIT IN XI'AN, EXCITATION AND GOVERNOR CIRCUIT BOARD IN MYANMAR: GOVERNOR BRAKE CABINET IN PIXIAN, SICHUAN
22. CASTING AND MACHINING FOR BEARING PAD OF 3000KW-600MW TURBINE AND GENERATOR, REPAIR FOR BEARING PADS
23. ROTATING SPEED MEASUREMENT DEVICE, EXPANSION AND AXIAL ISPLACEMENT MEASUREMENT DEVICE DIFFERENTIAL EXPANSION MEASUREMENT DEVICE, CONTROL MECHANISM FOR 2X200MW UNIT IN SHAOGUAN: COMPLETE UNIT OF HYDRAULIC SERVO MOTOR FOR 2X50MW UNIT IN JIANGMEN EXTRACTION CHECK VALVE, IP GOVERNOR MONITORING DEVICE OF VALVE LOCTION IN HP CONTROLVALVE
24. DESIGN AND MANUFACTURE MORE THAN 100 SETS OF CONDENSER FOR 3MW 600MW POWER PLANTS 2S.ROTOR, CASING AND AUXILARIES SUPPLY TO DONGFANG GROUP, HARBIN GROUP, BHEL, ALSTOM AND ETC.
25. SPARE PARTS SUPPLY FOR POWER PLANTS IN INDIA, INDONESIAAND ETC
26. SUNQUEST6.5 MW EFB BIOMASS POWER PLANT IN MALAYSIA
SCOPE: EPCC
27. AMIHAN 50MW WIND POWER PLANT IN CEBU, PHILLIPPINE
SCOPE: PROJECT INVESTMENT, EPCC, PMCAND O&M
Our company hopes that with the support and help of new and old customers, through the joint efforts of all employees, we will continuously improve product quality and innovate technology to provide the best Cogeneration Combined Heat Power Plant EPC Contractor. In order to survive and develop, and constantly improve competitiveness, our company maximally encourages employees, retains professional and technical personnel, and gives full play to the inherent potential of professional and technical personnel. We insist on taking strategy as the guide and brand as the core to provide customers with a full range of services.
You Might Also Like