Combined Cycle Power Plant Ccpp
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
We strive to become the most profitable and influential manufacturer of the Steam Turbine Parts, MSW Power Plant EPC Solution, Steam Turbine Generator Overhaul in the world. The company continuously strengthens basic management, perfects and improves rules and regulations, and continues to implement target management. With the respect for knowledge and the need for talents, the company has recruited, trained and introduced talents at all levels over the past few years. Our company provides the products and services needed by customers timely and effectively with the continuous progress of technology and experience.
The Service Provided By DTEC
● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
EPC Practice
● Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.
![]() | ![]() |
BOT Practice
Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.
Complete Set Of Equipment Supply Practice
Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.
Engineering & Supervision Practice
Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.
Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.
This style of cooperation is mainly happen in China with Chinese client.
The company will continue to develop and update more technologies and products, uphold the business philosophy of "integrity, professionalism, and win-win", adhere to the principle of customer first, quality first, and better serve the development of the Combined Cycle Power Plant Ccpp industry . We realize the coordination of current and long-term development, and the coordination of enterprise, society and environment, which is also the meaning and conscious pursuit of the survival and development of our company. Survival and development is the reason for the existence of enterprises, and our company must also survive and develop.