EPC Power Plant for Cement Factory

EPC Power Plant for Cement Factory

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

Through continuous research and development of new technology, through a thorough understanding of customer needs, through the fine operation of the internal management system, we produce high-quality Boiler Parts, Extraction Condensing Steam Turbine, Coal Fired Powe Plant EPC. We adhere to the corporate philosophy of "earnestly making products, honestly making market", decisively implementing organizational changes, introducing technical and management talents, and upgrading management. We always abide by the laws and regulations of the country and operate in compliance with the law.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


Through the continuous efforts of all employees, we have created a series of EPC Power Plant for Cement Factory representing the highest level of the times and provided customers with mature and complete services. From the highest quality materials, technical equipment to the most complete service system, each of our links has created the best products. Our production philosophy is, environmental protection, technology, high efficiency.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry