Ethiopia Biomass Power Plant EPC Contractor

Ethiopia Biomass Power Plant EPC Contractor

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

Our company takes the market as the guidance, our business is booming, our Boiler Parts, Biomass Power Plant EPC Solution, Coal-fired Steam Boiler regardless of variety or quality are worthy of the top of the industry. Since the establishment of our company, we always uphold the spirit of winning the trust of the world with quality. Over the years, with high-quality products, first- class service, ultra-low prices we win thee trust and favor of customers. We believe that employees with strong ability will overcome difficulties excellently and complete tasks better. All our employees inherit and carry forward the spirit of 'diligence, practicality and honesty', and earnestly implement the management concept of 'people-oriented, honest management, cooperation and win, and common development'.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


The demand of users is our pursuit. It is our firm belief to provide users with the most suitable Ethiopia Biomass Power Plant EPC Contractor and pragmatic services and it is also our tenet of 'people-oriented and honest management'. Adhering to the concept of technology-enhanced enterprise, we have been paying great attention to investment in scientific research and technical personnel training. We will meet greater challenges and opportunities in future development, and will continue to shoulder the banner of industry development and leadership.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry