Generator Power Plant EPC Contractor

Generator Power Plant EPC Contractor

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

We are committed to maintaining the high quality of our Steam Turbine Spares, Back Pressure Steam Turbine, Auxiliary Equipment from beginning to end and continuing to innovate and create greater value for our customers. Through multi-directional and multi-form external exchanges, we effectively develop resource potential, improve the quality of talent resources, and provide talent guarantee for sustainable development of the enterprise. Our company has always implemented strict quality assurance system, with exquisite production level and advanced management concept as the foundation, to provide customers with quite satisfactory products and services.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


We follow the example of international outstanding enterprises, with leading technology and stable Generator Power Plant EPC Contractor, and develop ourselves in serving the society. We have established a product development team and a modern management platform to keep pace with the times. The market is the sea, the quality is the ship, and the brand is the sail.