
Germany B Itzer Semi Hermetic Piston B Itzer Air Conditioner Compressor 4FC-3.2
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
We are committed to producing high-quality technologically leading Static Thyristor Generator, Boiler Drum, Steam Turbine Generator to enhance customer experience and gain their support. We are never satisfied with the status quo, not stagnant in front of achievements, not conforming to the old ways in front of new things. We strive to build quality capabilities throughout the process, build a complete and efficient quality management system, focus on listening to, understanding, and satisfying customer needs, and continuously improve customer satisfaction. We have a highly skilled and experienced staff team and a capable sales team, with many years of sales and service experience, and sincerely serve customers. Our company relies on science and technology to develop products, the enterprise is full of vitality, and the products are widely used at home and abroad.
The Service Provided By DTEC
● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
EPC Practice
● Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.
![]() | ![]() |
BOT Practice
Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.
Complete Set Of Equipment Supply Practice
Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.
Engineering & Supervision Practice
Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.
Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.
This style of cooperation is mainly happen in China with Chinese client.
With a forward-looking vision, we quickly invest in this Germany B Itzer Semi Hermetic Piston B Itzer Air Conditioner Compressor 4FC-3.2 industry, researching and exploring. As an experienced manufacturer, our team has strong R&D capabilities. One of our biggest advantages is that we can design products according to your requirements at any time. Our company creates the future with high standards and new technologies. While expanding our company, we also provide high-quality products and services for our customers.
You Might Also Like
Send Inquiry












