Livestock Dung/Chicken Shit Power Plant Renewable Energy

Livestock Dung/Chicken Shit Power Plant Renewable Energy

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

We have accumulated rich R&D experience, manufacturing experience, technology accumulation, modern management concept, and good reputation in the Boiler Pipes and Accessories, Bleed Condensing Steam Turbine, Overhaul and Mainteinance industry. Our core business philosophy is sincerity-based and excellence, because integrity is the way to be a person, the foundation of one's identity, and the first key to business philosophy. We start from the three aspects of "conceptual identity, strategic identity and emotional identity", and cultivate the correct core values and work concept of employees through political and ideological work to achieve the effect of cultural identity.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


We actively adopt the advanced and excellent processing methods of our peers and combine the years of experience of our technical staff, and continuously improve Livestock Dung/Chicken Shit Power Plant Renewable Energy, our products are sold very well at home and abroad. Our pursuit and company goal is to 'Always satisfy our customer requirements'. Our high-quality scientific research team, comprehensive modern scientific management system, and well-trained after-sales service team provide a strong guarantee for high-quality products and services.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry