Lock up Device for Bridge
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
While striving to create a better society, our strong sense of responsibility allows us to lead our Steam Turbine Parts, Biomass Steam Boiler, Blast Furnace Top Gas Recovery Turbine Unit (TRT) towards the trend of environmental protection and energy saving. In order to meet the needs of customers, we continue to introduce excellent materials, improve the process, strengthen quality control, and introduce new products. It is our eternal pursuit to continuously improve the value of our products and enterprise value with high quality products and services in place. The key to our success or failure is to think about the customer's heart, so that users can be moved. In order to gain profits and competitive advantages, our company has been insisting on technological innovation.
The Service Provided By DTEC
● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
EPC Practice
● Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.
![]() | ![]() |
BOT Practice
Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.
Complete Set Of Equipment Supply Practice
Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.
Engineering & Supervision Practice
Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.
Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.
This style of cooperation is mainly happen in China with Chinese client.
With advanced technology, perfect sales network and strong production capacity, we constantly achieve the business purpose of high quality of the Lock up Device for Bridge and sincere service. We provide innovative and excellent products, solutions and services to fully assist customers, enterprises and employees to achieve success. The company attaches great importance to the construction of corporate culture, and provides a good career promotion channel and development platform for employees.
You Might Also Like
Send Inquiry