Medium Temperature 2HP Air Cooling Bitzer Condensing Unit 2DC-2.2

Medium Temperature 2HP Air Cooling Bitzer Condensing Unit 2DC-2.2

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

Over the years, all employees of the company have consistently pursued the quality strategy and the spirit of excellence. We pay close attention to the development trends of Boiler Parts, Steam Turbine, Auxiliary Equipment at home and abroad, and timely penetrate them into the management and development concepts to better serve our customers. We uphold high standards and continue to carry out management reforms, pursuing simultaneous improvement of efficiency and value. We take quality and service as our tenet, insist on honesty and law-abiding to meet our customers' needs. Our service tenet is to do our best to the society, to our users, and to constantly surpass ourselves. We realize that difficulties and challenges often breed opportunities, and the key is to discover and grasp them.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


With the changes of the market, we will further improve the scientific and technological content of our Medium Temperature 2HP Air Cooling Bitzer Condensing Unit 2DC-2.2, and constantly introduce new products to meet the needs of our customers, so that our products and the progress of the society perfectly combined. We always pursue the company development scale and efficiency, as well as the sustainable development of enterprises. Our products constantly push through the old and bring forth the new, and constantly give new applications to our products.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry