Palm Power Plant EPC Project Contractor

Palm Power Plant EPC Project Contractor

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

Our company has a quality assurance system have been established for Parts and Auxiliary Equipment, Biomass Bulk Chain Grate Steam Boiler, Biomass and MSW Power Plant EPC. Our mission is to adhere to the people-oriented, system management and professional services, committed to the value of the enterprise and the value of employees. The company continues to establish and improve the staff training and training system, and the staff training implements closed-loop management of demand investigation, plan approval, implementation adjustment, effect evaluation and improvement. Due to our good products and services, we have received good reputation and credibility from local and international customers.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


Our company promises to provide customers with high-quality products and first-class services and promote the development of Palm Power Plant EPC Project Contractor industry. We insist on independent research and development and cooperation between industry, academia and research institutes to carry out technological innovation through multiple channels. Warmly welcome the majority of manufacturers to establish long-term partnership with us, we will sincerely for you to provide the best quality products and warm and thoughtful service.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry