Power Plant EPC Contractor for Textile Mill

Power Plant EPC Contractor for Textile Mill

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

We believe that only with excellent product quality of our Waste Heat Boiler, Circulating Fluidized Bed Steam Boiler, Extraction Back Pressure Type can we gain a long foothold in the market competition. We are committed to the continual evolution of our business model in order to support our customers and industry with convenience, high quality, short delivery time and competitive prices. The company adheres to the international management concept, localized attentive service, and always starts from the perspective of the market and the needs of customers. We continue to improve industrial development, safety and security, and corporate innovation to promote the common growth of the company and its employees.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


Our Power Plant EPC Contractor for Textile Mill is made of fine materials, exquisite workmanship and novel styles, which are well received by the market. With the adjustment of industrial structure, the continuous innovation of technology and the continuous technological progress of enterprises, more and more attention has been paid to high skilled talents in our company. The company focuses on user needs, and hopes to provide customers with high-quality products through professionalism and unremitting efforts.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry