Thermal, Combined Cycle Power Plant Project EPC Contractor

Thermal, Combined Cycle Power Plant Project EPC Contractor

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

We have found that traditional product design methods of our Coal Fired Powe Plant EPC Solution, Steam Turbine Generator, Steam Turbine no longer meet the design requirements of our customers, so we strive to find new design methods to meet the support of the product design process in high volume customization. We carry out standardized management of production, technology and quality, and all employees are based on the market with strict pragmatic management and continuous pioneering spirit. We will move forward steadily and continuously on a professional track, and we are willing to create a win-win situation with our customers! With the efforts of all employees, our company has formed a relatively complete quality management system and realized one-stop production, supply and sales.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


We provide customers with technology, reliable quality Thermal, Combined Cycle Power Plant Project EPC Contractor and complete technical solutions. The pursuit of greater customer satisfaction is our service tenet. Our core value is to pursue high-quality products and present exquisite and elegant packaging to enhance the high added value entrusted by customers. We firmly believe in the concept of consistent quality, service, integrity and responsibility. At the same time, we meet customer requirements with the most competitive prices, excellent quality, and best service.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry