Vietnam 1-660MW Coal Fired Power Plant EPC Contractor

Vietnam 1-660MW Coal Fired Power Plant EPC Contractor

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

We adhere to the principle of people-oriented, strict management, technology first, and perfect quality to provide customers with satisfactory Industrial Steam Turbine, Biomass Steam Boiler, Coal-fired Steam Boiler and services. Welcome to inquire. We have complete reliability testing equipment and the ability to quickly analyze problems to ensure quality and enhance product competitiveness. The company can provide professional and personalized one-stop overall solutions according to the actual needs of users.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


We have completed the re-adjustment of the entire product system and operation system to better provide quality Vietnam 1-660MW Coal Fired Power Plant EPC Contractor and services. Our company makes the enterprise's business scale gradually grow, the economic strength is enhanced, and the enterprise popularity further improves. The core of enterprise innovation is the renewal of technology and products.