22HP Bitzer Model Compressor Best Price 4je-22y/4j-22.2

22HP Bitzer Model Compressor Best Price 4je-22y/4j-22.2

● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
Send Inquiry
Product Introduction

Today, our company continues to develop and grow, we learn from advanced technology in the same industry and improve it, so that our Medium Condensing Steam Turbine, Oil/gas-fired Saturated Steam Boiler, Power Plant EPC and Service has unparalleled superiority. With professional technology, honest management, and continuous innovation, our company has developed rapidly. Strong economic strength and manufacturing strength, strict corporate management system and high-quality professionals make us your trusted partner. We earnestly do a good job in civilized production, especially maintain a good production order, reasonably equip station instruments, and ensure smooth production channels. Since the establishment of our company, following the major principles in business, we are endeavoring to adapt to the globalization while aiming at the international market.

The Service Provided By DTEC

EPC (Engineer-Procure-Construction)

BOT (Build-Operate-Transfer)

Complete set of Equipment Supply

Engineering and Supervision


EPC Practice

Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.


image001image003


BOT Practice

Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.


Complete Set Of Equipment Supply Practice

Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.


Engineering & Supervision Practice

Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.

Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.

This style of cooperation is mainly happen in China with Chinese client.


In the current increasingly fierce market competition, our company will continue to strive for perfection, continue to deepen the strength of corporate scientific management, improve the quality of 22HP Bitzer Model Compressor Best Price 4je-22y/4j-22.2, and provide customers with perfect and enthusiastic after-sales service. Our research team experiments on various developments in the industry for improvement in the products. Our harmony concept includes harmony with nature, harmony with society, harmony with competitors and harmony with employees.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry