Biomass Gasification System for Power Generation

Biomass Gasification System for Power Generation

1. Increase or decrease load is insensitive, there is a jump change.
2. Static test oil motive cannot be fully opened or fully closed.
3. steam turbine speed or electricity and heat load fluctuations.
4. Extraction and back pressure cannot be put into operation.
Send Inquiry
Product Introduction

We pay close attention to the quality, delivery, value and technology of our Small Condensing Steam Turbine, Coal Fired Boiler, Static Thyristor Generator and services. Our company actively undertakes social responsibility and has won the respect and praise from all walks of life with our good corporate citizenship image. Enterprises should pay attention to environmental problems in production and operation, apply for green pass, implement green accounting in management and green marketing in marketing. We vigorously cultivate the corporate execution culture, insist on cultivating innovative corporate culture, and strive to create an efficient, scientific and reasonable modern enterprise. Looking to the future, innovation is a guide to push us in the direction of progress letting us follow the right direction and continue to meet new challenges.

Speed regulation and security system Faults:

1. Increase or decrease load is insensitive, there is a jump change.

2. Static test oil motive cannot be fully opened or fully closed.

3. steam turbine speed or electricity and heat load fluctuations.

4. Extraction and back pressure cannot be put into operation.

5. Regulating valve seal is lax.

6. Steam leakage of valve stem.

7. The emergency breaking throttle, axial displacement breaking device, starting valve, emergency breaking and resetting device cannot hang the brake.

8. Additional security oil pressure and safety oil pressure cannot be established or the oil pressure is low.

9. Low speed emergency interrupt throttle, security operation box.

10. The oil injection test was unsuccessful.

11. LVDT calibration of turbine oil motive.

12. Configuration setting of WoodWard505, 505E, SPC and CPCⅡ ⅱ parameters.

13. The pulse oil pressure (signal oil pressure) of hydraulic spring-type oil motor cannot be established or is lower than the design value.

14. Oil motive shut down for too long.

15. OPC function cannot be put into use.

16. The rotary slide valve cannot rotate.

17. Can't run at full capacity.

18. Steam turbine load rejection speed soaring is too large.

19. Unequal rate adjustment of speed control system.


Main valve

1. When hot, the main valve can't be seated.

2. After the main valve is opened to a certain extent, it will automatically close.

3. The main valve cannot be opened.

4. The main valve does not open properly.

5. Large steam leakage.

6. The automatic shutoff cannot be tested for activities.

7. The opening of the automatic shutter is not in place.

8. The closing time of the main valve/automatic shutoff is too long


Oil system

1. The pressure of high-pressure oil pump is less than the design value.

2. The outlet pressure/inlet pressure of main oil pump of steam turbine is insufficient.

3. Insufficient pressure of turbine lubricating oil.

4. The oil return temperature of steam turbine is too high.

5. The outlet temperature of oil cooler is too high.

6. Insufficient outlet pressure of lubricating oil pump.

7. The three-way non-return valve is jammed.

8. The output of high-pressure oil pump does not match the system.

9. Poor oil return

10. Oil leakage of bearing seat


With strong strength and excellent quality assurance, our company is gradually developing into China's most powerful Biomass Gasification System for Power Generation brand with great momentum. Based on a positive, enthusiastic, and refined corporate work attitude and the corporate spirit of 'honesty, responsibility, hard work, and dedication', our company has established long-term partnerships with customers. We strive to ensure the safety of everyone, and truly from the thought and action of the safety first into practice.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry