
Tempered Crossing Bar Insulated Glass
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
We follow the direction of international popular development, follow the relevant international and national industry standards, high starting point, to provide users with Oil Station, Bleed Back Pressure Type, Oil/gas-fired Steam Boiler that is in line with the development trend. Our company abides by the quality policy of 'pursuing excellence and exceeding expectations' and strives to provide customers with quality products and services. Our company has a strong R&D team, excellent technical production personnel, and scientific and perfect management methods to provide customers with fast and convenient services. The company gathers scientific and technological elites, relying on strong technical strength and advanced production equipment, based on strict quality management, to provide customers with high-quality products. We have always insisted on doing our social responsibility as a corporate citizen for the progress of society, the prosperity of the nation and the strength of the country.
The Service Provided By DTEC
● EPC (Engineer-Procure-Construction)
● BOT (Build-Operate-Transfer)
● Complete set of Equipment Supply
● Engineering and Supervision
EPC Practice
● Provide EPC Service Of Waste Heat Recovery Power Station For Customers, Including Engineering Design, Technical Services, Equipment Procurement, Installation, Operation & Commissioning, Personnel Training, And Operation &Management.
![]() | ![]() |
BOT Practice
Provide project financing, construction, operation for customers. After a waste heat recovery power station is built on the financing basis of BOT, it is generally operated by the company (or project company) for 6~10 years, in period of which, benefits from energy recovery will pay back the company (or project company), and the customers will consume the power in accordance with the agreed electricity price between the customer and the company.
Complete Set Of Equipment Supply Practice
Supply waste heat recovery system integration for customers, including thermal dynamic system, electrical system, automation system, cooling water system, boiler water treatment system and ESP system. In order to improve overall performance and reliability of waste heat recovery power stations and to adapt them to the nature of cement kiln operation, the core components of waste heat boiler equipment are researched and developed by the company in a customized way of procurement from equipment manufacturers.
Engineering & Supervision Practice
Detail engineering for customers, including the overall plan, mechanical, electrical & automation, civil work, water supply & drainage, HVAC, environmental protection, security and other professional detail design, which are the guidance documents and technical basis for project construction and equipment installation.
Provide overall services for customers, including the feasibility report, consultation for complete equipment, supervision for on-site installation, production commissioning, personnel training, waste heat recovery power station operation management consulting and other services.
This style of cooperation is mainly happen in China with Chinese client.
Relying on advanced production equipment system, we realize standardized operation and provide users with high-quality Tempered Crossing Bar Insulated Glass in the shortest time. We seek credibility with good quality, and develop with good reputation, and hope to achieve mutual benefit in the future development with preferential price and perfect after-sales service! We have established a set of advanced modern enterprise management system and formed a fine management, marketing, R&D and production team.
You Might Also Like
Send Inquiry












